Client: Royal College of Surgeon In Ireland
- Value : €2 Million
- Size : 1,550 Sq.m
- Duration : 20 Weeks
Murcom was the main contractor, M & E coordinator and PSCS on the project. Strip out of the existing Mercer Library and fit out of General Entry Medicine (GEM). The works replaced the existing accommodation with student study, training and office accommodation over the three floors from upper ground level to second-floor level (3 Nr. floors). All works were completed within a "Live Campus Environment" beside student accommodation which is a "Listed Building" ensuring no disruption from noise or dust to existing document archive rooms, GP surgery and offices.
Design Team:
Henry J Lyon, Linesight, FDA & Axiseng.
The Full Project
This gallery will allow you to see some of the detailed finishes and high-quality standards that are involved in a Murcom project.