Overview

The restoration of the roof and internal ceilings was carried out on Senior House where rain had caused extensive damage to the original fabric. The lean-to roof was completely stripped, with original roof timbers repaired, 100mm Gutex Thermosafe Homogen insulation fitted along with vapour barrier, double battens and newly procured blue Bangor slates. We also carried out repairs to the stone masonry, fitted new lead flashings, supplied & fitted new cast-iron rain water goods. Internally the ceilings were replaced with like for like and re-decorated along with the exposed timber trusses. On the upper roof slopes, the standing seam lead roof finish was replaced, chimney stacks repaired and repointed and rooflights replaced. The scaffolding work for the high level roof works was extensive and required a temporary works design due to the complexity and overall height.

CLIENT:

Dublin City University

LOCATION:

All Hallows Campus, DCU, Dublin 9

COMPLETION DATE:

October 2022

DURATION:

22 Weeks

VALUE:

€760k

DESIGN TEAM:

Mesh Architects, Cora CE, Austin Reddy & Co

Previous project Next project

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you agree with it and you accept our privacy policy.