Salesian College Celbridge Extension

Overview

The renovation, reconfiguration and extension to the front entrance of this 40 year old school was a complex and challenging project with approximately 8.5 tonnes of structural steel installed, and new foundations and pads requiring the re-direction of existing foul & surface water pipework. Internally the office and administration area of the school was re-configured, with new reception hatches formed along with the new main door entrance, foyer and waiting area.

CLIENT:

Salesian College, Celbridge

LOCATION:

Maynooth Road, Celbridge, Co. Kildare

COMPLETION DATE:

August 2022

DURATION:

22 Weeks

VALUE:

€180k

DESIGN TEAM:

Coughlan & Associates Architects, GM Consulting Engineers